![Schweitzer Engineering Laboratories SEL-311B Instruction Manual Download Page 52](http://html.mh-extra.com/html/schweitzer-engineering-laboratories/sel-311b/sel-311b_instruction-manual_1216695052.webp)
3-8
Distance, Overcurrent, Voltage,
Date Code 20011205
and Synchronism Check Elements
SEL-311B Instruction Manual
32QF
|IAB|
50PP2
(Advanced Setting)
See Note 1 mAB < Z2P
_
+
MAB2
M2P
MBC2
MCA2
Zone 2 Phase Distance Logic for AB Phase Pair.
BC and CA Logic Is Similar.
Note 1: mAB = A-Phase to B-Phase Distance Calculation
Z2P = Zone 2 Distance Setting
VPOLV
ILOP
FSB
FSA
F32P
(Internal Element)
M311B049a
32QF
F32P
(Internal Element)
MABC2
Zone 2 Compensator Distance Logic
Note 2: ABC2 and PP2 are compensator distance element calculations.
|IAB|
50PP2
(Setting)
"C" in E21P
(Setting)
VPOLV
ILOP
|IBC|
|ICA|
See Note 2 ABC2 < 0
(Calc)
See Note 2 PP2 < 0
(Calc)
MPP2
_
+
_
+
_
+
"C" in E21P
(Setting)
MABC2
MPP2
Relay
Word
Bits
Relay
Word
Bits
Relay
Word
Bits
(unless
noted)
2
1
3
2
1
3
From Figure 4.14
From Figure 4.1
From Figure 4.15
Figure 3.5: Zone 2 Phase Distance Logic
Summary of Contents for SEL-311B
Page 6: ......
Page 8: ......
Page 10: ......
Page 24: ......
Page 26: ......
Page 122: ......
Page 124: ......
Page 138: ......
Page 168: ......
Page 172: ......
Page 254: ......
Page 282: ......
Page 306: ......
Page 348: ......
Page 364: ......
Page 366: ......
Page 448: ......
Page 460: ......
Page 466: ......
Page 476: ......
Page 482: ......
Page 494: ......
Page 500: ......
Page 522: ......
Page 526: ......
Page 528: ......
Page 534: ......
Page 536: ......
Page 550: ......
Page 570: ......
Page 586: ......
Page 600: ......