Date Code 20011205
Installation
2-9
SEL-311B Instruction Manual
1. Voltage Channel VS does not need to be connected. It is used only in voltage and synchronism check
elements and voltage metering.
2. In this example, current Channel IP provides current polarization for a directional element used to control
ground elements.
Figure 2.6: SEL-311B Relay Provides Distance and Overcurrent Protection, and
Reclosing for a Transmission Line (Current
-
Polarization Source Connected to
Channel IP)
Summary of Contents for SEL-311B
Page 6: ......
Page 8: ......
Page 10: ......
Page 24: ......
Page 26: ......
Page 122: ......
Page 124: ......
Page 138: ......
Page 168: ......
Page 172: ......
Page 254: ......
Page 282: ......
Page 306: ......
Page 348: ......
Page 364: ......
Page 366: ......
Page 448: ......
Page 460: ......
Page 466: ......
Page 476: ......
Page 482: ......
Page 494: ......
Page 500: ......
Page 522: ......
Page 526: ......
Page 528: ......
Page 534: ......
Page 536: ......
Page 550: ......
Page 570: ......
Page 586: ......
Page 600: ......