Inspection
item
Inspection content
Inspection
period
Inspection method
Assessment
base
Corrective
measures to
fault
Daily Annual
Cooling fan
Check abnormal
vibration or noise
○
View inspection and
auditory inspection
All OK
Replace
cooling fan
Check no dust or
chipping stacked
○
View inspection
Remove
Power
elements
Check no dust or
chipping stacked
○
View inspection
All OK
Remove
Check resistance
between terminals
○
Check using
three-functional
meter
No short circuit
or circuit break
for three phase
output
Replace
power
elements or
inverter
Condenser
Check for odor or
leakage
○
View inspection
All OK
Replace
condenser or
inverter
Check for
expansion or
distortion
○
Always inspection and maintenance is not necessary for S3100A.
For long time safety operation, periodical inspection shall be prepared to the inverter in accordance with
descriptions below. Inspection shall only performed after power supply is off and charging LED off (since residual
voltage may exist in the large capacity condensers.)
1.Remove dirty stacking inside the machine
2.Check screws securing terminals or elements are securely tightened; if not, tighten the screws.
Summary of Contents for S3100A Series
Page 1: ...S3100Aseries inverter General Open loop Vector Control IM User manual User Manual ...
Page 24: ...20 Size 5 Unit mm S3100A 4T45G 55P 4T110G Size 6 Unit mm S3100A 4T110G 132P 4T160G 185P ...
Page 25: ...21 Size 7 Unit mm S3100A 4T185G 200P 4T220G Size 8 Unit mm S3100A 4T220G 250P 4T315G ...
Page 26: ...22 Size 9 Unit mm S3100A 4T315G 355P 4T400G 450P Size 10 Unit mm S3100A 4T450G 500P 4T500G ...