Web Interface - Outputs
None -
The relay is disabled. This is the default value for this function.
59th Minute (1) -
The clock performs an hourly correction that takes 8 seconds and occurs between
XX:57:54 and XX:58:02. It also performs two daily corrections: one at 5:00AM and one at 5:00PM. Each
daily correction is a single 14 second pulse which lasts from 5:57:54 to 5:58:08.
58th Minute (1) -
The clock performs an hourly correction that takes 55 seconds and occurs between
XX:58:05 and XX:59:00 of every hour. It also performs two daily corrections: one at 5:00AM and another
at 5:00PM. Each daily correction is ten relay cycles, each cycle is 95 seconds long, and the cycles begin at
5:05AM/PM, 5:07, 5:09, 5:11, 5:13, 5:15, 5:17, 5:19, 5:21, and 5:23 respectively.
58th Minute (2) -
The clock performs an hourly correction that takes 60 seconds and occurs between
XX:58:00 and XX:59:00. It also performs two daily corrections: one at 5:00AM and one at 5:00PM. Each
daily correction is made of twelve relay cycles, and each cycle consists of 65 seconds on and 25 seconds
off
58th Minute (3) -
The clock performs an hourly correction that takes 60 seconds and occurs between
XX:58:00 and XX:59:00. It also performs two daily corrections: one at 5:00AM and one at 5:00PM. Each
daily correction is made of twelve relay cycles, and each cycle consists of 60 seconds on and 120 seconds
off.
58th Minute (4) -
The clock performs an hourly correction that takes 55 seconds and occurs between
XX:59:05 and XX:59:00. It also performs two daily corrections: one at 5:00AM and one at 5:00PM. Each
daily correction is made of twelve relay cycles, each cycle is 55 seconds long, and the cycles begin at
5:03:05AM/PM, 5:07:05, 5:11:05, 5:15:05, 5:19:05, 5:23:05, 5:27:05, 5:31:05, 5:35:05, 5:39:05, 5:43:05,
and 5:47:05 respectively.
National Time & Rauland (1) -
The clock performs an hourly correction that takes 25 seconds and occurs
between XX:00:00 and XX:00:25. It also performs two daily corrections: one at 6:00AM and one at
6:00PM. Each daily correction is made of twenty four relay cycles consisting of 25 seconds on, followed by
35 seconds off.
National Time & Rauland (2) -
The clock performs an hourly correction that takes 25 seconds and occurs
between XX:00:00 and XX:00:25. It also performs two daily corrections at 6:00:25AM and 6:00:25PM.
Each daily correction is a single 24 minute pulse which lasts from 6:00:25AM/PM to 6:24:25.
Rauland Digital -
The clock will reset the secondary clock to 12:00:00AM, then advance the time on the
secondary clock by one minute for every 0.5 seconds that the Digital line is shorted to ground.
Once a Day Pulse -
The clock relay will close at a specific time and for an amount of time decided by the
clock circuit settings If this is selected, boxes for Hours, Minutes, Seconds, and Duration will appear.
69
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com