10 11
12 13
27
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double and Flag Mount Installation
10) Run power and communication wiring (if
applicable) through the base of the mounting pole
and out through the appropriate hole(s) in the sides
of the pole. Look at the position of the wiring panel
on the back of your clocks for help determining
which hole is appropriate for your wires.
Connect
the grounding wire in the pole to the grounding
wire from the wall/ceiling at this time.
11) Pass screws through the base and into the wall
anchors or drilled holes in the wall/ceiling. Secure
tightly.
12) Pass wires through grommet(s) and connect
grommet(s) to pole(s).
13)
If this is a flag-mount clock
, install the close
cap in the unused hole.