2. Preventive Maintenance
PM Table
Key for the PM Table
A = Adjust, C = Clean, I = Inspect, L = Lubricate, R = Replace
• Units of measure in the PM Interval column: Metric: 1,000 meters, Feet: 1,000 feet
Main Machine (G180)
Description
Q'ty
PM Interval
PM
Comments
Metric
Feet
Development
Developer (1,000 g)
2
27.5
90.0
R
Replace if necessary.
Development Filter
5.5
18.0
C
Dry cloth or vacuum cleaner
Development Roller Gear
5.5
18.0
I
Development Lower Casing
5.5
18.0
C
Dry
Cleaning
Cleaning Blade
1
11.0
36.0
I/R Replace if necessary.
Cleaning Entrance Seal
11.0
36.0
C
Lens paper or dry cloth.
Side Seals
11.0
36.0
C
Inside Cleaning Unit
11.0
36.0
I
Dry cloth or vacuum cleaner
Used Toner Bottle
5.5
18.0
C
Empty used toner
Registration
Registration Rollers
5.5
18.0
C
Damp cloth
Paper Registration Sensor
5.5
18.0
C
Blower brush
103
2
Summary of Contents for Neptune-P1
Page 1: ...Neptune P1 Machine Code G180 SERVICE MANUAL June 2007 Subject to change...
Page 103: ...1 Installation 102 1...
Page 114: ...Rear Cover 1 Rear cover x 2 A 2 Controller cover B x 1 Paper Exit Unit Common Procedures 113 3...
Page 177: ...3 Remove the SFDB A x 2 x 2 standoffs x 2 3 Replacement and Adjustment 176 3...
Page 180: ...4 Remove the cooling fan D x3 x1 Others 179 3...
Page 402: ...Toner End Recovery Flow Chart Development 401 6...
Page 449: ...6 Details 448 6...
Page 457: ...MEMO 456...