![Raven OmniSeed Viper Pro Calibration & Operation Manual Download Page 77](http://html.mh-extra.com/html/raven/omniseed-viper-pro/omniseed-viper-pro_calibration-and-operation-manual_788947077.webp)
4
Manual No. 016-3001-015 Rev. C
65
Initial Set Up and Navigation
For Example:
The following mapping was completed for granular sections in the previous section (
review the Mapping
Granular Sections for Switch Box Controls
for information on mapping granular product
sections).
The granular product sections currently occupy ‘Wired As’ values 1, 2 and 3. Therefore, the first liquid
section must be mapped to ‘Wired As’ 4.
3.
Map the next liquid section according to the same liquid product or control channel.
Note:
If multiple liquid products will be controlled with the OmniSeed system, the next ‘Wired As’ section
may not be the next Viper Section.
4.
Continue mapping ‘Wired As’ values for sections associated with the first liquid product. It may be
necessary to touch the
Next
or
Prev
buttons to view all section mapping values for the first liquid product.
5.
After completing the ‘Wired As’ values for the first liquid product, repeat the process to enter the ‘Wired As’
values for the next liquid product beginning with the section furthest to the left on the implement.
For Example:
Recall that the implement from previous examples is configured for two liquid products with five control
sections each. Also recall the following requirements:
•
Sections must be configured from left to right on the Viper Pro field computer.
•
‘Wired As’ values should go in order of product control channels.
Therefore, the Viper Section 2 displayed on the Map Sections to Wiring screen is actually wired to the
second liquid product and the next ‘Wired As’ section is actually Viper Section 3.
For this example, the ‘Wired As’ values for liquid product 1 should be entered as shown above. The
remaining Viper Sections are therefore wired to product 2 and ‘Wired As’ values will resume from left to
right for this control channel.
1
2
3
0
0
0
1
2
3
1
2
3
0
0
0
1
2
3
4
5
6
7
Summary of Contents for OmniSeed Viper Pro
Page 1: ...Viper Pro Software Version 3 10 OmniSeed Calibration Operation Manual ...
Page 10: ...Table of Contents viii OmniSeed Viper Pro Calibration Operation Manual ...
Page 98: ...Chapter 4 86 OmniSeed Viper Pro Installation Operation Manual ...
Page 150: ...Chapter 6 138 OmniSeed Viper Pro Installation Operation Manual ...
Page 222: ...Chapter 10 210 OmniSeed Viper Pro Installation Operation Manual ...
Page 240: ...Chapter 11 228 OmniSeed Viper Pro Installation Operation Manual ...
Page 251: ...Manual No 016 3001 015 Rev C 239 FIGURE 2 OmniSeed System Diagram 3 Bin D N 054 3001 026 ...
Page 256: ...Appendix A 244 OmniSeed Viper Pro Installation Operation Manual ...
Page 284: ...Appendix D 272 OmniSeed Viper Pro Installation Operation Manual ...
Page 292: ...Appendix G 280 OmniSeed Viper Pro Installation Operation Manual ...
Page 300: ...Appendix H 288 OmniSeed Viper Pro Installation Operation Manual ...
Page 304: ...Index 292 OmniSeed Viper Pro Calibration Operation Manual ...
Page 307: ......