![Raven OmniSeed Viper Pro Calibration & Operation Manual Download Page 265](http://html.mh-extra.com/html/raven/omniseed-viper-pro/omniseed-viper-pro_calibration-and-operation-manual_788947265.webp)
Manual No. 016-3001-015 Rev. C
253
Advanced Section Setup
The standard boom setup covered in the
section on page 53 is sufficient for a standard boom
configuration with the sections end-to-end with no overlap or skips.
The advanced section settings allow the operator to customize boom or implement sections individually to
reflect specialized configurations with overlaps, skips or offset sections.
1.
Select
Menu
, then
Setup
, and
Boom
.
2.
Touch
Next
until the Boom Setup Summary screen is displayed.
3.
Touch a boom section displayed in the section configuration overview or select the section summary entry
at the bottom of the screen to access additional section settings. The Boom Section Settings screen for the
selected section will display.
4.
The
Section Width
for the section is displayed at the top of the screen. Touch the displayed value and use
the on-screen keypad to enter a new section width value if necessary.
5.
Touch the
Left/Right
offset value and use the on-screen keypad to enter the distance of the section
midpoint from the GPS antenna. If the section is offset to the left of the GPS antenna, enter a negative
value for the Left/Right offset value.
Note:
The left/right offset must be measured parallel to the boom or implement width. Select the
More
Info
button to display an overview of the offset measurements and directions.
Summary of Contents for OmniSeed Viper Pro
Page 1: ...Viper Pro Software Version 3 10 OmniSeed Calibration Operation Manual ...
Page 10: ...Table of Contents viii OmniSeed Viper Pro Calibration Operation Manual ...
Page 98: ...Chapter 4 86 OmniSeed Viper Pro Installation Operation Manual ...
Page 150: ...Chapter 6 138 OmniSeed Viper Pro Installation Operation Manual ...
Page 222: ...Chapter 10 210 OmniSeed Viper Pro Installation Operation Manual ...
Page 240: ...Chapter 11 228 OmniSeed Viper Pro Installation Operation Manual ...
Page 251: ...Manual No 016 3001 015 Rev C 239 FIGURE 2 OmniSeed System Diagram 3 Bin D N 054 3001 026 ...
Page 256: ...Appendix A 244 OmniSeed Viper Pro Installation Operation Manual ...
Page 284: ...Appendix D 272 OmniSeed Viper Pro Installation Operation Manual ...
Page 292: ...Appendix G 280 OmniSeed Viper Pro Installation Operation Manual ...
Page 300: ...Appendix H 288 OmniSeed Viper Pro Installation Operation Manual ...
Page 304: ...Index 292 OmniSeed Viper Pro Calibration Operation Manual ...
Page 307: ......