![Raven OmniSeed Viper Pro Calibration & Operation Manual Download Page 112](http://html.mh-extra.com/html/raven/omniseed-viper-pro/omniseed-viper-pro_calibration-and-operation-manual_788947112.webp)
Chapter 5
100
OmniSeed™ Viper Pro™ Installation & Operation Manual
Existing Jobs
Jobs previously created on the Viper Pro may be reopened to complete report information or to resume a field
operation. The following options are available when opening an existing job file:
•
View the existing job
•
Add to the existing job
Viewing an Existing Job
When viewing an existing job, application information may not be added. Use this feature to view job
information without editing or modifying any application data.
1.
Touch
Menu
, then
Start Job
,
From File
, and
View Only
. The Select Existing Job File screen opens.
2.
Select a job from the list and touch
OK
. Viper opens the job.
3.
Touch
Menu
,
Close Job
to close the job.
Note:
If the field computer is enabled to receive web notifications via the Slingshot server, a prompt or
dialogue may be displayed after the Close Job button is selected. Refer to the Wireless File
Transfer section on page 217 for more information.
Adding to an Existing Job
Previously closed jobs may be reopened and the application or coverage map may be modified by adding to
the application. This feature is useful if a job has been closed because of a change in weather conditions, lack
of materials, etc.
Note:
When re-opening an existing job, Viper will automatically pause the application. To add to the job,
un-pause the job before starting product application to allow the Viper to modify the job
information.
The original data is used when adding to the job file. Make sure that all files created in or used by the existing
job are still available on the Viper Pro field computer and verify that the original machine configuration is the
same as when the job was initially started. These parameters include number of booms, boom widths, boom
offsets, etc.
Note:
The original swath pattern will be used to provide guidance when the existing job is restarted. Due
to shifts in satellite geometry between active job sessions, the operator should perform a swath
recalibration to update the guidance information and swath position for the actual machine
location.
1.
Select
Menu
, then
Start Job,
From File
, and
Add to Job
. The Select Existing Job File screen displays.
2.
Select the existing job to open from the list and touch
OK
. Viper loads the job information.
3.
Touch
Menu
, and
Cont. Job
to add to the job.
Note:
If the field computer is enabled to receive web notifications via the Slingshot server, a prompt or
dialogue may be displayed after the Close Job button is selected. Refer to the Wireless File
Transfer section on page 217 for more information.
Summary of Contents for OmniSeed Viper Pro
Page 1: ...Viper Pro Software Version 3 10 OmniSeed Calibration Operation Manual ...
Page 10: ...Table of Contents viii OmniSeed Viper Pro Calibration Operation Manual ...
Page 98: ...Chapter 4 86 OmniSeed Viper Pro Installation Operation Manual ...
Page 150: ...Chapter 6 138 OmniSeed Viper Pro Installation Operation Manual ...
Page 222: ...Chapter 10 210 OmniSeed Viper Pro Installation Operation Manual ...
Page 240: ...Chapter 11 228 OmniSeed Viper Pro Installation Operation Manual ...
Page 251: ...Manual No 016 3001 015 Rev C 239 FIGURE 2 OmniSeed System Diagram 3 Bin D N 054 3001 026 ...
Page 256: ...Appendix A 244 OmniSeed Viper Pro Installation Operation Manual ...
Page 284: ...Appendix D 272 OmniSeed Viper Pro Installation Operation Manual ...
Page 292: ...Appendix G 280 OmniSeed Viper Pro Installation Operation Manual ...
Page 300: ...Appendix H 288 OmniSeed Viper Pro Installation Operation Manual ...
Page 304: ...Index 292 OmniSeed Viper Pro Calibration Operation Manual ...
Page 307: ......