DL4300 Appliance
Forcing an archive job
124
Table 44. Archive recycle options
Text Box
Description
Incremental
Lets you add recovery points to an existing archive.
It compares recovery points to avoid duplicating data
that already exists in the archive.
Replace this Core
Overwrites any pre-existing archived data pertaining
to this core but leaves the data for other cores intact.
Erase completely
Clears all archived data from the directory before
writing the new archive.
13. Optionally select Build recovery points chains (fix orphans).
14. Click Finish.
Rapid Recovery applies your changes to the archive.
Parent topic
Pausing or resuming a scheduled archive
If you have an archiving job scheduled to recur, you can pause or resume this action as necessary.
There may be times when you want to pause a scheduled archive job, such as if you need to change the
destination archive location. Also, if you opted to initially pause archiving when you performed the
procedure to pause or resume scheduled archive.
1. From the Rapid Recovery Core Console, and click the More menu on the icon bar, and then click
Archives.
2. On the Archives page, under Scheduled Archives, do one of the following:
•
Select the preferred archive, and then click one of the following actions as appropriate:
▪
Pause
▪
Resume
•
Next to the preferred archive, click the drop-down menu, and then click one of the following actions as appropriate:
▪
Pause
▪
Resume
The status of the archive displays in the Schedule column.
Parent topic
Forcing an archive job
Using this procedure, you can force Rapid Recovery to perform the archive job on a scheduled archive at any
time.