
SYSTEM START-UP AND CONFIGURATION
40
Parker Automation Controller Installation Guide
Apply power to the PAC for the First Time
Once the following steps have been completed, 24VDC can be applied to the Controller and PACIO
Modules:
PAC Controller has been mounted to a DIN rail
PACIO Modules are attached to the Controller
24VDC input power wiring has been connected to the Controller
Field wiring and 24VDC power wiring has been connected to the PACIO Modules
Communication/Network cables are connected to the Controller
per the following table:
LED Color Status Table
LED
Software
Controlled
Color
States
Description
Power
no
Blue
Red
Off
Internal Controller power supplies good
Internal Controller power supplies bad
Off indicates no power or fuse blown
Run/Stop
yes
Red
Green
White
Off
No programs running
Programs running
The boot process is running
Error
yes
Red
Off
System error
No system error.
Summary of Contents for PAC
Page 11: ...CHAPTER 1 Product Overview...
Page 18: ......
Page 19: ...CHAPTER 2 Installation...
Page 33: ...CHAPTER 3 System Start up and Configuration...
Page 69: ...CHAPTER 4 PACIO Modules...
Page 143: ...2 After adding the device and code to the project you will configure the IO map as displayed...
Page 155: ...PAC with 400XR series...
Page 156: ...PACIO MODULES 156 Parker Automation Controller Installation Guide...
Page 157: ...PAC with 400LXR...
Page 158: ...PACIO MODULES 158 Parker Automation Controller Installation Guide PAC with SMH sensors...
Page 159: ...CHAPTER 5 Communication Interfaces Optional...
Page 176: ......
Page 177: ...CHAPTER 6 Troubleshooting...
Page 188: ...TROUBLESHOOTING 188 Parker Automation Controller Installation Guide...
Page 189: ...APPENDIX A PAC System Specifications...
Page 195: ...APPENDIX B Additional Information...