
Agency Approvals
The PAC Controller was tested in accordance with the product family standard for Electrical Equipment for
Measurement, Control and Laboratory use. EN 61326-1:2006 + CRG:2011 / IEC 61326-1:2005 Immunity
requirements for equipment used in Industrial Locations. Harmonic Current Emissions EN 61000-3-2:2006 +
A2:2009 / IEC 61000-3-2:2009, Voltage Fluctuations and Flicker EN 61000-3-3:2008 / IEC 61000-3-3:2008.
European Community Approvals Table
Test
Specification
Harmonic Current Emissions
EN 61000-3-2:2006 + A2:2009
IEC 61000-3-2:2009
Voltage Fluctuations and Flicker
EN 61000-3-3:2008
IEC 61000-3-3:2008
Electrostatic Discharge Immunity
IEC 61000-4-2:2008
Radiated Electromagnetic Field Immunity
IEC 61000-4-3:2010
Electrical Fast Transient Burst Immunity
IEC 61000-4-4:2012
Surge Immunity
IEC 61000-4-5:2005
Radio Frequency Common Mode Immunity
IEC 61000-4-6:2008
Power Frequency Magnetic Field Immunity
IEC 61000-4-8:2009
Voltage Interrupts Immunity
IEC 61000-4-11:2004
Radiated & Conducted Emissions
CISPR 11 Group 1, Class A
EN 55011:2009 + A1:2010
CISPR 11:2009 + A1:2010
EN61010-1:2010
Safety Requirements for Electrical Equipment for
Measurement, Control and Laboratory use. Part 1
General Requirements
EN61010-2-201:2013
Safety Requirements for Electrical Equipment for
Measurement, Control and Laboratory use. Part 2-201
Particular Requirements for Control Equipment
Underwriters Laboratories Approvals Table
Test
Specification
UL 61010-1, 3rd Edition, 2012-04-17
UL File E243373
Electrical Equipment for Measurement, Control and
Laboratory use. Part 1: General Requirements
CAN/CSA-C22.2 No. 61010-1, 3rd Edition, 2012-04
Electrical Equipment for Measurement, Control and
Laboratory use. Part 1: General Requirements
UL 61010-2-201
Safety requirements for electrical equipment for
measurement, control, and laboratory
use, Part 2-201: Particular requirements for
control equipment
IEC 60529, Edition 2.1 + Corr. 1:2003 + Corr. 2:2007 +
Corr. 3:2009
Protection Degree IP20
Summary of Contents for PAC
Page 11: ...CHAPTER 1 Product Overview...
Page 18: ......
Page 19: ...CHAPTER 2 Installation...
Page 33: ...CHAPTER 3 System Start up and Configuration...
Page 69: ...CHAPTER 4 PACIO Modules...
Page 143: ...2 After adding the device and code to the project you will configure the IO map as displayed...
Page 155: ...PAC with 400XR series...
Page 156: ...PACIO MODULES 156 Parker Automation Controller Installation Guide...
Page 157: ...PAC with 400LXR...
Page 158: ...PACIO MODULES 158 Parker Automation Controller Installation Guide PAC with SMH sensors...
Page 159: ...CHAPTER 5 Communication Interfaces Optional...
Page 176: ......
Page 177: ...CHAPTER 6 Troubleshooting...
Page 188: ...TROUBLESHOOTING 188 Parker Automation Controller Installation Guide...
Page 189: ...APPENDIX A PAC System Specifications...
Page 195: ...APPENDIX B Additional Information...