
10
Select
Configure schedule
or
Change schedule
and change the backup schedule.
Ensure:
• The interval is short enough to minimize data loss when a restore is required
• The IPC Application Controller is powered ON during the backup periods
• The time the backup is scheduled does not interfere with normal operation
or uncheck
Run backup on a schedule
if an automatic backup is not possible.
11
Select
OK
.
12
Select
Save settings and run backup
to create the first backup.
Precautions for Correct Use
Create backups according to the preventive maintenance schedule to prevent data loss and
system integrity issues.
Refer to
7-1-1 Preventive Maintenance Schedule
Additional Information
• Check your backup to ensure it contains all data required for a restore.
• Refer to http://windows.microsoft.com/ for Backup and Restore details.
• Refer to
Restore a Custom Backup with Windows
on page 7-34 for the Restore Procedure.
7 Maintenance
7-13
IPC Application Controller User's Manual (I632)
7-1 Preventive Maintenance
7
7-1-4
Create Backup and Repair Data
Summary of Contents for AC1-152000
Page 1: ...IPC Application Controller User s Manual I632 E 03...
Page 4: ...Introduction 2 IPC Application Controller User s Manual I632...
Page 32: ...Revision History 30 IPC Application Controller User s Manual I632...
Page 38: ...1 Overview 1 6 IPC Application Controller User s Manual I632...
Page 62: ...2 Hardware 2 24 IPC Application Controller User s Manual I632...
Page 86: ...3 Software 3 24 IPC Application Controller User s Manual I632...
Page 162: ...5 Installation 5 50 IPC Application Controller User s Manual I632...
Page 174: ...6 Operating Procedures 6 12 IPC Application Controller User s Manual I632...
Page 216: ...7 Maintenance 7 42 IPC Application Controller User s Manual I632...
Page 227: ...I Index I 1 IPC Application Controller User s Manual I632 I...