![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_system-hardware-manual_3943845259.webp)
Issue 2.0
SV9100 System Hardware Manual
4-21
8.
Load the SRAM data saved in step 1, above.
From the PCPro “System Data Save/Load/Verify” menu load
the data from the specified file.
- OAI FLF Memory
Battery replacement is complete.
3.1.2.2
GPZ-IPLE Daughter Board Installation
1.
Figure 4-10 Installing the GPZ-IPLE Daughter
to install the GPZ-IPLE daughter board,
if required.
2.
Ensure the power supply is
OFF
, then slide the GCD-CP10
into Slot 1 in the Controlling Chassis.
3.1.2.3
SD-A1/SD-B1 Installation
1.
Figure 4-6 GCD-CP10 Blade Layout on page 4-15
to install the SD-A1 or SD-B1 SD card, if required.
2.
Ensure the power supply is
OFF
, then slide the SD card
(label side up) into the slot until it clicks.
To remove: Carefully push on the SD card until it clicks and
release. Card can be removed from the slot.
3.1.2.4
Background Music (BGM) or Music on Hold (MOH)
1.
If external Background Music (BGM) or Music on Hold
(MOH) is being installed, plug the cable into the AUX1 or
AUX2 pin jack connector on the GCD-CP10. The other end
of the cable plugs into the music source.
Refer to the PGDAD in Chapter 9, section
for details on connecting to a
music source.
When the system software is upgraded, the flash
memory is updated with the new software version.
Either the Hot or Cold start-up method can be used or
the system can be upgraded using system software.
Refer to
2.6.1 Performing a Cold Start on page 4-9
,
2.6.2 Performing a Hot Start on page 4-10
Performing a Software Upgrade on page 4-13
.
Customer information is stored in the RAM memory
which is restored after a power failure is cleared. The
lithium battery in the system saves the RAM memory
when power is lost.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...