Issue 2.0
SV9100 System Hardware Manual
4-11
2.6.3.2
Port Defaults
With the default settings, the ports are assigned as follows:
In the initial configuration:
All Programmable Function keys are line keys (e.g., key 1 is
line 1).
All trunks are loop start DTMF.
2.6.3.3
Setting Up Extension Circuit Types
Run Program 10-03 to set up extension circuit types as
required. The system automatically detects and assigns most
circuit types when the device is connected.
1.
Dial 10-03-01.
2.
Press TRANSFER to Select the slot, port or channel (with
ESIU Blades) to be programmed.
3.
Set the terminal type or option as needed.
If the system has DSS Consoles, Program 30-02 must be
used to define DSS extension assignments.
As the system recognizes the extension devices automatically,
when replacing the connected device, it must be undefined in
Program 10-03 prior to connecting the new device. For
example, if a port was previously used for a telephone and a
DSS Console is to be installed in that same port, the telephone
must first be undefined in Program 10-03 before the console is
connected.
2.6.3.4
Saving Your Configuration
When programming is completed, to exit out of the program
option and save changes to the GCD-CP10:
1.
Press
EXIT
to exit the program options, if needed.
2.
Press
Speaker
.
Saving System Data is displayed if changes were made to
system programming.
3.
The display shows Complete Data Save when completed
and the telephone becomes idle.
Table 4-4 Default Port Settings
Station Ports:
Port 1~300 : 200~499
Port 301~960 : 5000~5659
Virtual Station
Ports:
Port 1~99 : 201~299
Port 100~512 : No Setting
Trunk Ports:
1~400
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...