Issue 2.0
SV9100 System Hardware Manual
3-97
10.
Using two screws, install the Battery Tray Bracket. Refer to
3-122 Removing Battery Tray Bracket on page 3-96
.
11.
Insert Battery Connection Cable into cable guides. Refer to
3-124 Installing Battery Connection Cable
12.
Install the Battery Tray Cover and tighten the two screws. Refer to
Figure 3-124 Installing Battery Connection Cable
13.
Slide the Battery Trays into the CHSG LARGE BATT BOX.
14.
Install the Battery Tray Suppressor while pulling the Battery
Connection Cable(s) through the cutouts provided. Refer to
3-125 Connecting Battery Cables on page 3-98
. Secure with two
screws.
15.
Plug the Battery Connection Cable(s) into the Fuse Unit. Refer to
Figure 3-125 Connecting Battery Cables on page 3-98
.
Figure 3-124 Installing Battery Connection Cable
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...