![NEC Univerge SV9100 System Hardware Manual Download Page 546](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_system-hardware-manual_3943845546.webp)
Issue 2.0
7-70
Installing SV9100 Optional Equipment
4.
In places where water or other fluids comes in contact with the
equipment.
5.
In areas near high-frequency machines or electric welders.
6.
Near radio antennas (including shortwave).
13.4.5 Powering On the IP Video Doorphone
1.
When powering on the Doorphone, it may take up to 60 seconds until
a doorphone starts. The Power lamp will begin blinking. When the
lamp turns solid, the Doorphone is available.
2.
If the Power lamp continues blinking for more than 70 seconds, the
authentication to the main device may have failed. Reset the
doorphone to attempt authentication again.
13.5 Installation
13.5.1 Connect a Door Unlock Device to the IP Video Doorphone
Connecting the Door Unlock Device to an IP Video Doorphone (using Relay
contacts):
1.
When the Unlock Device Relay output is normally closed. The 2-wire
cable is connected the
C
and
NC
terminals.
2.
When the Unlock Device Relay output is normally open. The 2-wire
cable is connected to the
C
and
NO
terminals.
Figure 7-80 C and NC Terminal Connections
Figure 7-81 C and NO Terminal Connections
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...