Issue 2.0
2-34
SV9100 System Specifications
6.2.1
Power Supply Specifications
Table 2-20 Power Supply Specification
110VAC
220VAC
230-240VAC
Power
Requirements
110VAC@15A
Controlling/Base
Chassis
220VAC@15A
Controlling/Base
Chassis
230-240VAC@15A
Controlling/Base
Chassis
Power
Consumption
Base Chassis
= 259VA
4 Chassis total
= 1036VA
Base Chassis
= 262VA
4 Chassis total
= 1048VA
Base Chassis
= 276VA
(1.15Ax240V)
4 Chassis total
= 1104VA
Input Voltage
(Rated Voltage)
90VAC to 264VAC
(100VAC/120VAC/220VAC/230-240VAC)
Frequency
47Hz - 63Hz (Rated Frequency: 50/60Hz)
Phase and Wire
Single Phase, 2 Line + PE Type
Grounding
Requirements
No.14 AWG Copper Wire
Feeding Voltage
D
term
/OPX/DID: -48V
SLT: 25mA/ -28V
Output Power
Base Chassis
= 130W
4 Chassis total
= 520W
Base Chassis
= 130W
4 Chassis total
= 520W
Base Chassis
= 130W
4 Chassis total
= 520W
AC Input I
Base Chassis
= 2.35A
4 Chassis total
= 9.4A
Base Chassis
= 1.19A
4 Chassis total
= 4.76A
Base Chassis
= 1.15A
4 Chassis total
= 4.6A
VA@110V
VA@220V
VA@230V-240V
Base Chassis
= 259VA
4 Chassis total
= 1036VA
Base Chassis
= 262VA
4 Chassis total
= 1048VA
Base Chassis
= 276VA
(1.15Ax240V)
4 Chassis total
= 1104VA
KWh@AC Input I x
110V/1000
KWh@AC Input I x
220V/1000
KWh@AC Input I x
230-240V/1000
Base Chassis
= 0.259 KWh
4 Chassis total
= 1.036 KWh
Base Chassis
= 0.262 KWh
4 Chassis total
= 1.048 KWh
Base Chassis
= 0.276 KWh
(1.15Ax240V)
4 Chassis total
= 1.104 KWh
BTU (KWh x 3413)
Base Chassis
= 884 BTU
4 Chassis total
= 3536 BTU
Base Chassis
= 894 BTU
4 Chassis total
= 3577 BTU
Base Chassis
= 942 BTU
4 Chassis total
= 3768 BTU
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...