Issue 2.0
3-68
Installing the SV9100 Chassis
S
ECTION
5
F
LOOR
M
OUNTING
THE
C
HASSIS
5.1 Floor Mounting the 19” (CHS2UG) Chassis
The CHS2UG controlling and expansion chassis can be mounted on the floor
using the CHS BASE UNIT and the CHS2UG JOINT BRACKET KIT.
5.1.1
CHS2UG Chassis Installation
1.
Use the template shown in
Figure 3-83 Floor Mount Spacing Guide
for required spacing before drilling holes for 0.39” (10mm) anchor
bolts (locally procured).
2.
Mark and drill the four holes required to install the CHS BASE UNIT.
3.
Using anchor bolts, secure the CHS BASE UNIT to the floor. Refer to
Figure 3-84 Secure CHS BASE UNIT with Anchor Bolts
for screw
Figure 3-83 Floor Mount Spacing Guide
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...