Issue 2.0
3-46
Installing the SV9100 Chassis
4.2 Wall Mounting the 9.5” Gateway (CHS2UG GW) and Base
(CHS2UG B) Chassis
When wall mounting the chassis, ensure the wall can support the weight of the
chassis and (25 lbs per system chassis ---- including blades, cords, power supply,
etc.). The chassis is secured to the wall with a wall mount bracket.
Optional wall mounting procedures exist for the 9.5” chassis.
Option 1
: the
mounting bracket is secured to the wall and the chassis is attached to the bracket.
Option 2
attaches the bracket to the 9.5” chassis and then, using the key-holes as
a guide, the assembled unit slides over screws secured to the wall using the
template shown in
To wall mount the Base and Expansion chassis as a combined unit, refer to
4.2.1.1 Wall Mounting the 9.5” Base (CHS2UG B) and Expansion (CHS2UG E)
Chassis on page 3-54
To wall mount the CHS2UG B with the external battery installed, refer to
4.2.2.2 Wall Mounting the CHS2UG B with the CHS2UG B Small Batt Box
on page 3-63
4.2.1
Option 1 – Wall Mounting the 9.5 inch Base
(
CHS2UG B
)
Chassis
When mounted, clearance between the wall and the CHS2UG B/
CHS2UG E chassis is approximately 1.7 in (43mm) due to height of
the wall mounting bracket.
The chassis must be mounted horizontally with the slot (front) side on
the right.
Due to EXIFU cable length, a maximum of 2 (1 CHS2UG B and 1 CHS2UG E)
chassis can be wall mounted. If additional chassis are to be mounted, consider
using the floor mounting procedure.
Figure 3-53 Wall Mount Positioning for 9.5” Base/Expansion Chassis
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...