Issue 2.0
3-54
Installing the SV9100 Chassis
4.2.1.1
Wall Mounting the 9.5” Base (CHS2UG B) and
Expansion (CHS2UG E) Chassis
1.
Figure 3-65 Wall Mount Spacing
Guide (Base and Expansion Chassis)
for required spacing
before drilling.
2.
Mark and drill four holes marked
A
,
B
,
C
and
D
.
3.
Mount Anchor bolts (locally procured), in holes
A
and
B
drilled in step 2.
Because the bracket (upper) will be hooked onto the head
of the anchor bolts, allow the head to protrude
approximately 0.14 to 15 in (3.5 to 4.0mm) from the wall
(refer to (
Figure 3-66 Anchor Bolt from Wall (9.5”
).
Figure 3-65 Wall Mount Spacing Guide (Base and Expansion Chassis)
TIP
Plywood should first be installed on the wall where
the chassis will be positioned. This allows secure
anchoring of the screws, which support the weight
of the chassis.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...