![NEC Univerge SV9100 System Hardware Manual Download Page 331](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_system-hardware-manual_3943845331.webp)
Issue 2.0
SV9100 System Hardware Manual
4-93
6.3.4
Status LEDs
The table below shows the user-level description of the front panel
LEDs in RGA mode.
6.3.5
LED Indications
Active LED – Red/Green
The Active LED is controlled by the DSP and indicates the board
operational status. The LED has red/green capability.
Reset: red solid on, green solid on.
GCD-CP10 not detected: solid green.
DSP waiting for application code download: flash green once per
second.
Router application running: flash green twice per second.
Voice processor not running: flash red and green (orange) twice per
second.
Third party application running: flash green five times per second.
Busy/App LED – Red/Green
The Busy/App LED is controlled by the main processor and indicates the
port status. The LED has red/green capability.
Reset or main processor boot problem: red solid on, green solid on
(orange).
Main processor booting: solid green.
Router application communicating on backplane: off.
One or more ports active after third party application running: solid
red.
Table 4-36 GCD-RGA Status LEDs
Reset
Reset Just
Released
Booting
OS
OS
Running
Running with
0 License
Apps
Licensed
APP on
RGA
Licensed
APP is
Running
Licensed
App has
Port Busy
Bus LED
Red
Red
Green
Green
Green
Off
Off
Red
Run LED Orange
SF
SF
MF
FF
MF
FF
FF
SF
MF
FF
S
low
F
lash
M
edium
F
lash
F
ast
F
lash
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...