vi
Table of Contents
Issue 2.0
Installation and Safety Precautions................................................. 4-4
Installing an Extension or Trunk Blade............................................ 4-5
2.2.2 Order of Installing Extension Blades.............................................. 4-6
2.2.3 Order of Installing Trunk Blades .................................................... 4-7
Installing GCD-COT( ), GCD-4DIOPB, GCD-4ODTB or
GCD-2BRIA Blades ..................................................................4-7
Installing GCD-PRTA (PRI/E1) Blades .....................................4-8
Remove an Extension or Trunk Blade ............................................ 4-8
Uninstalling a Blade Slot Through Software.................................... 4-9
Blade Capacities ............................................................................. 4-9
Powering Up the SV9100 System................................................... 4-9
2.6.1 Performing a Cold Start ................................................................. 4-9
2.6.2 Performing a Hot Start ................................................................. 4-10
2.6.3 Resetting the System................................................................... 4-10
Initial Programming.................................................................4-10
Port Defaults ...........................................................................4-11
Setting Up Extension Circuit Types ........................................4-11
Saving Your Configuration......................................................4-11
Backing Up/Restoring a Database..........................................4-12
2.6.4 Performing a Software Upgrade .................................................. 4-13
Common Control Blades....................................................................... 4-15
GCD-CP10 (SV9100 Central Processing Unit) ............................. 4-15
Battery Installation and Removal ............................................4-19
GPZ-IPLE Daughter Board Installation...................................4-21
SD-A1/SD-B1 Installation .......................................................4-21
Background Music (BGM) or Music on Hold (MOH)...............4-21
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...