Issue 2.0
4-10
Installing the SV9100 Blades
2.6.2
Performing a Hot Start
The section describes how to load system software from flash memory and
customer data from RAM memory.
1.
Turn the system power off.
2.
After it has powered down, press the button again to power the
system back up. Wait approximately two minutes.
3.
When the system has completed reloading the software, the Status
LED is flashing on the GCD-CP10.
2.6.3
Resetting the System
This section describes resetting a system that is running. Observe the
important information listed below.
To reset the system:
2.6.3.1
Initial Programming
The system can be programmed using three methods:
Programming using a multiline terminal
PC Programming
Web Programming
To program using a multiline terminal, enter programming
mode:
1.
Go to any working display telephone.
2.
Do not
lift the handset.
In a newly installed system, use extension (port 1).
3.
Press
Speaker
.
4.
#
#
.
5.
Dial the system pa
Transfer
.
CAUTION
IMPORTANT CONSIDERATIONS
System software is loaded from flash memory, and customer
data is from RAM memory.
Password
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...