Issue 2.0
7-2
Installing SV9100 Optional Equipment
The PGDAD connects to any available digital extension port. The terminal
connections made in the PGDAD and the jumper settings determine what
features are used for each circuit.
2.2 LED Indications
Table 7-1 PGDAD LED Indications
lists the LED indications and provides a brief
description of each.
2.3 Setting up PGDAD Connections
This sections provides instructions for setting up the PGDAD connections.
Figure 7-1 PGDAD
Channel 2
Status LED
Channel 1
Status LED
Table 7-1 PGDAD LED Indications
LED
Indication
Note
LED 1
Green LED when
CH1 in use.
Flashing green LED indicates DIP Switch setting
and programming for CH1 are conflicting.
LED 2
Green LED when
CH2 in use.
Flashing green LED indicates DIP Switch setting
and programming for CH2 are conflicting.
CAUTION
❍
If the PGDAD is to be wall mounted, all the cable connections should
be made first.
❍
For the module to ID correctly after setting the jumpers, set the circuit
type to 0 for the module port in Program 10-03-01 prior to connecting
the line cord to the PGDAD.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...