![NEC Univerge SV9100 System Hardware Manual Download Page 77](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_system-hardware-manual_3943845077.webp)
Issue 2.0
SV9100 System Hardware Manual
2-5
S
ECTION
3
M
AXIMUM
S
YSTEM
C
APACITIES
3.1 Trunk/Port/Channel Capacities
The CHS2UG is a compact 19” chassis that has six universal slots, one expansion
slot and one MPS7101 (power supply unit). When the GCD-CP10 is installed in
the first CHS2UG, it is called the
Controlling Chassis
. Additional chassis, called
Expansion Chassis
, can be installed to increase the capacity of the system to
meet the customer’s business needs.
Figure 2-2 19” Controlling and Expansion Chassis
and
Gateway and 19” Maximum System Capacities – Trunks/Ports/Channels
illustrate, the system can be expanded from 64 ports to 896 ports by vertically
stacking a maximum of three additional chassis onto the controlling chassis. This
provides a maximum of 24 slots and 368 digital terminals. To obtain the maximum
port capacity of 896 ports, two systems can be linked together via an IP
connection.
The maximum slot and channel capacities are listed in
Gateway and 19” Maximum System Capacities – Trunks/Ports/Channels
.
Table 2-2 SV9100 9.5” Gateway and 19” Maximum System Capacities – Trunks/Ports/Channels
Number of:
9.5”
Chassis
19” Chassis
System
Maximum
x 1
(CPU + 2
Slots)
x 1
(6 Slots)
x 2
(12 Slots)
x 3
(18 Slots)
X4
(24 Slots)
Number of Timeslots
1
55
111
222
333
444
444
DT400/DT300 TDM (-48V)
32
80
176
272
368
Total 896
SLT (-28V)
32
80
176
272
368
SLT (-48V)
8
20
44
68
92
DT800/DT700 IP
896
Desktop Applications
(Desktop Client, Desktop Client with
Shared Services and SoftPhones)
256
Total 256
SIP/WLAN
896
Total 896
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...