Issue 2.0
SV9100 System Hardware Manual
3-53
14.
Lift the shaft and close the 9.5 inch chassis. To secure the chassis to
the wall, tighten the knurled screws located on the upper and lower
brackets.
15.
Connect grounding wire to chassis. Refer to Chapter 4 paragraph
Installing the 9.5” Base (CHS2UG B) and Expansion (CHS2UG E)
Chassis on page 3-24
for complete details on grounding the system.
16.
3.5.5 Install AC Power Cord on 9.5” Base and Expansion
for installation of the power cord or, Chapter 6
paragraph
2.1 Installation and Safety Precautions on page 4-4
for
installation of blades.
Figure 3-64 Chassis Installed (9.5” Chassis)
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...