![NEC Univerge SV9100 System Hardware Manual Download Page 470](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_system-hardware-manual_3943845470.webp)
Issue 2.0
6-20
Installing SV9100 Cordless Telephones
3.1.2.7
BT Information
You can view the following information about the BHA-L UNIT:
Firmware and hardware versions.
Bluetooth module information and standard.
Installed profile versions.
Device address and name.
S
ECTION
4
O
PTIONAL
H
EADSETS
4.1 D
term ®
USB Wireless Headset
This headset supports WebDial 2.1.4.0 or higher, Softphone 310 and SP30
Softphone version 9 or higher with digital encryption, TIA810a compliance, and a
noise-canceling microphone for secure, clear, and quiet conversations. It has a
200-foot range and includes nine hours talk time.
The headset can be converted to accommodate over-the-head or over-the-ear
styles.
Figure 6-28 Setting Bluetooth Information
Figure 6-29 D
term
USB Wireless Headset (CS50-USB)
Volume/Mute
Control
Talk Button
On-Line Indicator
Microphone
Ringer Switch On/Off
Headset Docking Cradle
Charge Indicator
Status Indicator
AC Power
Adapter Port
Charge Contacts
Stand
Base Unit
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...