![NEC Univerge SV9100 System Hardware Manual Download Page 535](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_system-hardware-manual_3943845535.webp)
Issue 2.0
SV9100 System Hardware Manual
7-59
12.2 Connector Pin-Outs on COIU Blade for Power Failure Circuits
Table 7-5 RJ-61 Cable Connector
provides the pin-outs for the RJ-61 cable
connector.
12.3 Installing the Power Failure Telephones
1.
Connect an RJ-61 connector to the COIU Blade installed in the system.
2.
Install a modular jack for each single line telephone supporting PF
operation. The modular jack should be within six feet of the phone.
3.
For each extension, run one-pair 24 AWG station cable from the
cross-connect block to a modular jack.
4.
Terminate the extension leads to GRN/RED of the modular jack. Terminate
the unused leads to the jack. Refer to
Figure 7-66 Power Failure Connector
(CN3) Shown on GCD-4COT( ) Blade
Table 7-5 RJ-61 Cable Connector
RJ-61 Cable Connector - CN13, SLT Interface for Power Failure
Pin No.
Connection
1
–
2
–
3
Circuit 2 - Tip
4
Circuit 1 - Ring
5
Circuit 1 - Tip
6
Circuit 2 - Ring
7
–
8
–
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...