Issue 2.0
SV9100 System Hardware Manual
4-25
J7
SD Memory Card Connection
J9
Backboard Connection
J14
GPZ-IPLE Connection
J28
Lithium Battery Socket - for backup of SRAM data and RTC
(Real Time Clock) data
LOAD (S5)
Load Switch
S6
SENSE Switch
Table 4-9 GCD-CP10 Connections (Continued)
Connector
Connector Description
Table 4-10 GCD-CP10 RJ45 Cable Connector Pin-Outs
USB Cable Connector – J13 (Type A, Female)
(USB 1.1/2.0 Standard)
Pin No.
Signal
1
Vcc
2
-D
3
+D
4
GND
Ethernet Cable Connector – J4 (RJ-45)
(10Base-T/100Base-TX/1000Base-T Port)
Pin No.
Connection
1
Tx+
2
Tx-
3
Rx+
4
–
5
–
6
Rx-
7
–
8
–
1 2 3 4
1
8
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...