Issue 2.0
3-78
Installing the SV9100 Chassis
6.2 Stand Mounting the 9.5” CHS2UG B Chassis
The 9.5” chassis can be stand mounted using the brackets supplied. The following
section describes this procedure.
1.
Position the 9.5” Base Chassis so that the EXIFU slot is on top.
2.
Align the Base unit with holes
A
,
B
,
C
and
D
on the lower side of the
CHS2UG B chassis. Attach with the provided M4 x 14 screws.
WARNING
This bracket is not for use with a combined Base (CHS2UG B) and
Expansion (CHS2UG E) chassis. A combined Base and Expansion
chassis should only be rack or wall mounted.
NOTE
Using the chassis stand unit (stand/floor mounting), will increase the
height of the chassis by 50 mm.
Figure 3-95 Attaching the Base Stand
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...