3-84
Installing the SV9100 Chassis
7.
Refer to
3.3.5 Install AC Power Cords on 19” Chassis on page 3-20
continue installation of the chassis or, Chapter 6 paragraph
and Safety Precautions on page 4-4
for installation of blades.
7.2 Rack Mounting the 9.5” Base (CHS2UG B) and Expansion
(CHS2UG E) Chassis
To rack mount the combined Base (CHS2UG B) and Expansion (CHS2UG E)
chassis, the IP5D-RACK MOUNT BAR SET is required.
1.
Attach the metal rack mount brackets to each side of the chassis using the
screws provided (refer to
Figure 3-104 Attach Rack Mount Brackets to 9.5”
WARNING
Controlling and Expansion chassis must be installed vertically for proper
air circulation.
Figure 3-104 Attach Rack Mount Brackets to 9.5” Chassis
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...