3.
Install a modular jack for each PGDAD. For each module, run one-
pair 24 AWG station cable from the cross-connect block to a modular
jack. Ground the unused pair.
4.
Terminate the extension leads to GRN/RED of the modular jack.
Terminate the unused leads to the jack.
5.
Install bridging clips as required.
6.
Plug a modular line cord from the mod jack to the CN1 connector on
the PGDAD.
7.
Connect the two-conductor station cable from the CN5 connectors in
the PGDAD to the external relay.
S
ECTION
7
E
XTERNAL
R
ECORDING
S
YSTEM
/E
XTERNAL
R
INGER
7.1 External Recording System or External Ringer
The
PGDAD
allows the connection of an external recording system or external
ringer. With a customer-provided tape recorder, when an extension user dials the
ACI analog port extension number, they can automatically start the recorder and
activate the record function. When the user hangs up, the recording stops and the
tape recorder turns off. For tape recording, connect the tape recorder AUX input
jack to the
PGDAD
jack. Connect the recorder control leads (if available) to the
CTL (control relay) jack. By using Department Calling, you can arrange multiple
tape recorders into a pool. When an extension user dials the Department Group
pilot number, they reach the first available tape recorder in the pool.
The relays in the
PGDAD
can optionally control customer-provided external
ringers (loud bells) and buzzers. When an extension user dials the ACI analog
port extension number, the associated
PGDAD
relay closes and activates the
NOTE
The relay closes when the Door Box/external page
zone is called. The maximum applied voltage is 24vDC
at 0.5A for each contact.
Figure 7-14 GCD-CP10 Page Connections
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...