![NEC Univerge SV9100 System Hardware Manual Download Page 242](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_system-hardware-manual_3943845242.webp)
Issue 2.0
4-4
Installing the SV9100 Blades
S
ECTION
2
I
NSTALLATION
Pre-installation planning is essential. Advanced planning minimizes installation time,
cost, and disruption of the customer business activities.
2.1 Installation and Safety Precautions
Never install telephone wiring during a lightning storm.
Never install telephone jacks in wet locations unless the jack is specifically
designed for wet locations.
Never touch uninsulated telephone wires or terminals unless the telephone line
is disconnected at the network interface.
Use caution when installing or modifying telephone lines.
Ground the Controlling and Expansion chassis before installing or removing the
blades.
The Expansion Chassis
must be installed with the system power OFF
.
Do not
touch the blade components.
Carry the blade in a conductive polyethylene bag to prevent static electricity
until ready to install the blade.
When installing or removing the blades from the chassis, the installer must wear
a grounded wrist strap to protect the blade from static electricity.
Although it is recommended to install the blades with the
system power
OFF
,
most blades can be installed hot except for the following that
must be installed
with the power OFF
:
GCD-CP10
GPZ-BS10 and GPZ-BS11
WARNING
Observe the following precautions when installing the blades to avoid
static electricity damage to hardware or exposure to hazardous
voltages.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...