Issue 2.0
4-60
Installing the SV9100 Blades
3.
Connect the cable from the NT1 Network Termination cable to the
CN7 or CN8 connector on the GCD-2BRIA blade and/or GPZ-2BRIA
daughter board. (Refer to
Figure 4-21 GCD-2BRIA Blade on page
for the location of the connectors on the blade.)
5.3.3
LED Indications
LED indications for the GCD-2BRIA are listed in
. Each LED is listed with its associated function and LED
and Operational status.
Figure 4-21 GCD-2BRIA Blade on page 4-58
for the location of the
LEDs on the blade.
Table 4-24 GCD-2BRIA LED Indications
LED Indication
Operation Status
Remarks
Live LED
(Green)
Busy LED (Red)
On
On
System Initializing
–
Flash (1s)
On
The assignment of the unit is refused.
When you exceed the system
capacity.
When the main software version is
not matched.
Flash (1s)
Trouble found during self-diagnostics.
–
Flash
(100ms)
On
Normal
Operation
A Channel is busy (use
another from CH1 ~ CHx).
–
Off
All channels are idle.
–
Off
On
Unit Busy
A Channel is busy (use
another from CH1 ~ CHx).
–
Off
All channels are idle.
–
Flash 80ms (On/
Off) x 3/400ms
Off
Downloading firmware.
–
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...