Issue 2.0
SV9100 System Hardware Manual
3-93
8.2.1
Floor Mounting the CHSG LARGE BATT BOX
1.
Use the template shown in
Figure 3-117 Floor Mount Spacing Guide
for required spacing before drilling holes for 0.39” (10mm) anchor
bolts (locally procured).
2.
Mark and drill the four holes required to install the CHS BASE UNIT.
WARNING
❍
Because of injury from falling equipment, wall mounting
the CHSG LARGE BATT BOX is not recommended.
❍
Mounting the CHSG LARGE BATT BOX directly on the
floor is not recommended.
TIP
❍
The CHS BASE UNIT raises the height of the CHSG
LARGE BATT BOX 120mm (4.72”).
❍
When the CHSG LARGE BATT BOX and CHS2UG are
connected for long term use, the CHS2UG JOINT
BRACKET KIT is used.
Figure 3-117 Floor Mount Spacing Guide
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...