Issue 2.0
SV9100 System Hardware Manual
3-71
5.1.2
Multiple CHS2UG Chassis Installation
Expansion chassis can be secured to the CHS BASE UNIT and require an
additional CHS2UG JOINT BRACKET KIT per chassis.
1.
Install the five rubber feet to the bottom of each chassis.
2.
Using supplied screws in the CHS2UG JOINT BRACKET KIT, attach
metal brackets to both ends of the 19” chassis and the CHS BASE
UNIT. Refer to
Figure 3-88 Install Metal Brackets with Screws
.
Figure 3-87 Install Rubber Feet for Multiple Chassis
Figure 3-88 Install Metal Brackets with Screws
Metal
Brackets
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...