Issue 2.0
SV9100 System Hardware Manual
4-103
7.3.2
Outside Lines
An RJ-61 connector is authorized by the FCC for connection of CO lines.
The lines are connected in sequence in this termination block. Therefore,
the lines must be ordered in the appearance order best suited to the user.
Refer to
Table 4-40 MDF Cable Connections (Station) on page 4-100
or
Table 4-41 MDF Cable Connections (Trunk) on page 4-102
for information
about the MDF Connector Assembly Cable positions, the cable number,
and lead functions.
Ground Start and/or Loop Start, Loop Dial, DID/OPX, E&M Tie lines, and E1
trunks can be connected to this system. Using only twisted-pair wiring to
cross connect the lines from the RJ-61 termination block to the MDF is
recommended.
6
46
21
VI–BL
BL–VI
GN
RD
T
R
T
R
T
R
T
R
RA
RB
RA
RB
TA–1
TB–1
RA
RB
47
22
VI–OR
OR–VI
GN
RD
T
R
T
R
T
R
T
R
–
TA
–
TA
RA–1
RB–1
–
TA
48
23
VI–GN
GN–VI
GN
RD
T
R
T
R
T
R
T
R
TB
–
TB
–
TA–2
TB–2
TB
–
49
24
VI–BR
BR–VI
GN
RD
T
R
T
R
T
R
T
R
–
–
–
–
RA–2
RB–2
–
–
50
–
–
–
–
–
–
–
–
–
–
25
–
–
–
–
–
–
–
–
–
–
Table 4-41 MDF Cable Connections (Trunk) (Continued)
Connector
MDF
Pin
No.
Running
Cable
Station
Cable
DTL
COT( )
DIOPB
PRTA
BRIA
CCTA
4
8
DID
OPX
PRI
T1
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...