
Rev.1
Page 1-
19
DIRECT CONNECTION TO A CENTRALIZED DRAINING POINT
Follow the instructions shown below for a
correct direct connection
to a centralized draining point:
– Insert the silicone tube (provided) or other suitable plastic tube on hose union A; push the tube all the way on and lock with the plastic tie or other means;
– Cut the tube to measure, push the free end on the connection provided on the centralized draining point and lock with the plastic tie or other means;
e
Make sure the tube is not bent, crushed or obstructed in any way.
The following diagram provides an indicative arrangement of the components:
A
Clip
Was her
Clip
Pipe
To t he cent ralized
draining point
Centraliz ed
draining point
Support plane
This point must be at level lower
than t he steriliz er ’s support plane
e
The connection point to the central drain must be lower than the sterilizer's support surface. Otherwise, the tank may not empty correctly.
Summary of Contents for millennium B
Page 1: ...Rev 1...
Page 243: ...Rev 1 Gr7 INDEX GROUP 7 COVERS FRAME COVER 1 DOOR COVER 2 FRONT FRAME 3 SERVICE DOOR 4...
Page 270: ...Rev 1 Page 4 4 HYDRAULIC DIAGRAM CHAMBER HEAT EXCHANGER WP VP Main tank...
Page 271: ...Rev 1 Page 4 5 EXPLODED VIEWS TABLE 1...
Page 272: ...Rev 1 Page 4 6 TABLE 2...
Page 273: ...Rev 1 Page 4 7 TABLE 3...
Page 274: ...Rev 1 Page 4 8 TABLE 4...
Page 275: ...Rev 1 Page 4 9 TABLE 5...
Page 276: ...Rev 1 Page 4 10 TABLE 6...