
Rev. 1
Page 2-
34
When the wait phase ends, the pressure verification phase, true and proper, begins (
LEAKAGE PERIOD
), with a duration of 10 minutes:
V A C U U M T E S T
L E A K A G E P E R I O D
1 0 : 0 0
- 0 . 7 9 b a r 0 6 : 4 8
In this phase, a variation of
up to ±0.02 bar
is allowed, compared to the initial phase value.
Higher variations cause the test to fail. The time is counted down until the phase is completed.
When this phase is also completed, the pressure is brought back to atmospheric pressure.
V A C U U M T E S T
L E V E L L I N G
- 0 . 2 9 b a r 1 7 : 1 9
When the program finishes, the display will read:
V A C U U M T E S T
T E S T P A S S E D
- 0 . 0 1 b a r 1 7 : 4 4
The end of the program is signaled with a beep.
e
If the pressure change exceeds the pre-set limit, the program is interrupted and alarm message is generated. See a complete description
of the alarms in
Problem solution
.
The duration of the test is about
18 minutes
.
When the door is opened at the end of the program, a report of the test cycle is printed with all the salient data.
For complete details about printed reports, refer to
Print report examples
.
Summary of Contents for millennium B
Page 1: ...Rev 1...
Page 243: ...Rev 1 Gr7 INDEX GROUP 7 COVERS FRAME COVER 1 DOOR COVER 2 FRONT FRAME 3 SERVICE DOOR 4...
Page 270: ...Rev 1 Page 4 4 HYDRAULIC DIAGRAM CHAMBER HEAT EXCHANGER WP VP Main tank...
Page 271: ...Rev 1 Page 4 5 EXPLODED VIEWS TABLE 1...
Page 272: ...Rev 1 Page 4 6 TABLE 2...
Page 273: ...Rev 1 Page 4 7 TABLE 3...
Page 274: ...Rev 1 Page 4 8 TABLE 4...
Page 275: ...Rev 1 Page 4 9 TABLE 5...
Page 276: ...Rev 1 Page 4 10 TABLE 6...