Rev. 1
Page 3-
41
A 200
LCD INDICATION
Alarm description
Effect/Signaling
Possible cause / Check
Proposed solution
HEATING PROBLEM
Preheating phase not
performed within the
preset time
Pre-vacuum phase PV1 not
started within 30’ from the
cycle start
Intervention of the steam generator safety
thermostat
Restore the safety thermostat and repeat the sterilization
cycle.
Intervention of the heating resistor safety
thermostat
Restore the safety thermostat and repeat the sterilization
cycle.
Steam generator clogged
Replace the lower section of the steam generator
- see card Gr4-6
Fault in the board
Replace the board - see card Gr1-1
CPU board uncalibrated
Send the sterilizer to the Mocom Service department
Software release before E0008 / BP00320
Update the software – see Attachment K
Lack of water during the previous cycle
Advice the user on the correct water level check
Check the cartridges of the steam generator
Restore the connections
Replace the failed cartridge – see card Gr1-19
Replace the CPU board –see card Gr1-1
Summary of Contents for millennium B
Page 1: ...Rev 1...
Page 243: ...Rev 1 Gr7 INDEX GROUP 7 COVERS FRAME COVER 1 DOOR COVER 2 FRONT FRAME 3 SERVICE DOOR 4...
Page 270: ...Rev 1 Page 4 4 HYDRAULIC DIAGRAM CHAMBER HEAT EXCHANGER WP VP Main tank...
Page 271: ...Rev 1 Page 4 5 EXPLODED VIEWS TABLE 1...
Page 272: ...Rev 1 Page 4 6 TABLE 2...
Page 273: ...Rev 1 Page 4 7 TABLE 3...
Page 274: ...Rev 1 Page 4 8 TABLE 4...
Page 275: ...Rev 1 Page 4 9 TABLE 5...
Page 276: ...Rev 1 Page 4 10 TABLE 6...