
Rev. 1
Page 3-
55
A 259
LCD INDICATION
Alarm description
Effect/Signaling
Possible cause / Check
Proposed solution
PROCESS TIMEOUT
Process phase (from
PV1 to PROCESS) not
reached within the
preset time
Process phase not reached
within 35’ timeout
Sterilization chamber overloaded
Advice the operator for properly loading of the sterilization
chamber
Restore the safety thermostat and repeat the sterilization
cycle.
Intervention of the steam generator safety
thermostat
Replace the safety thermostat - see card Gr1-12
Clean properly the gasket and the parabola board
Steam leakage from the door gasket
Replace the door gasket - see card Gr6-1
Identify the valve and clean it
Steam leakage from a valve
Replace the valve causing the problem
- see cards Gr2
Steam leakage from a pipe
Replace the pipe causing the problem
Replace the lower section of the steam generator
- see card Gr4-6
Steam generator clogged
Different distilled water must be used
Fault in the board
Replace the CPU board - see card Gr1-1
CPU board uncalibrated
Send the sterilizer to the Mocom Service department
Summary of Contents for millennium B
Page 1: ...Rev 1...
Page 243: ...Rev 1 Gr7 INDEX GROUP 7 COVERS FRAME COVER 1 DOOR COVER 2 FRONT FRAME 3 SERVICE DOOR 4...
Page 270: ...Rev 1 Page 4 4 HYDRAULIC DIAGRAM CHAMBER HEAT EXCHANGER WP VP Main tank...
Page 271: ...Rev 1 Page 4 5 EXPLODED VIEWS TABLE 1...
Page 272: ...Rev 1 Page 4 6 TABLE 2...
Page 273: ...Rev 1 Page 4 7 TABLE 3...
Page 274: ...Rev 1 Page 4 8 TABLE 4...
Page 275: ...Rev 1 Page 4 9 TABLE 5...
Page 276: ...Rev 1 Page 4 10 TABLE 6...