ENGINE <DOHC>
Engine Assembly
ENGINE ASSEMBLY
AND INSTALLATION
Pre-removal Operation
l
Eliminating fuel pressure in fuel lines
(Refer to GROUP
lnspectior
of
Components.)
of the hood
(Refer to GROUP
of engine coolant
(Refer to GROUP
Service.:
of transaxle assembly
(Refer to GROUP 22,
*Removal of radiator assembly
(Refer to GROUP
Post-installation Operation
l
installation of radiator assembly
(Refer to GROUP
l
Installation of transaxle assembly
Removal steps
1. Connection for accelerator cable or
throttle cable (Refer to GROUP
Service Adjustment Procedures.)
2. Connection for throttle cable (Auto-cruise
control)
3. Connection for fuel return hose
4. Connection
booster vacuum
hose
Connection for fuel pressure solenoid
(Turbo)
6. Connection for EGR solenoid
(Turbo: California)
7. Connection for air hose A (Turbo)
8. Connection for air hose (Turbo)
Connection for fuel high pressure hose
O-ring
Connection for heater hoses
TSB Revision
Summary of Contents for 1989 Galant
Page 2: ......
Page 4: ...00 z NOTES ...
Page 274: ...13 132 NOTE ...
Page 586: ...NOTES ...
Page 650: ...NOTE ...
Page 664: ...NOTES ...
Page 688: ...NOTES ...
Page 690: ......
Page 692: ......
Page 694: ......
Page 696: ......
Page 698: ......
Page 700: ...c ...
Page 702: ......
Page 704: ......
Page 706: ......
Page 708: ......
Page 710: ......
Page 712: ......
Page 714: ......
Page 716: ......
Page 718: ......
Page 720: ......
Page 722: ......
Page 724: ......
Page 729: ...23 23 NOTES ...
Page 860: ...NOTES ...
Page 921: ...NOTES ...
Page 948: ...33B 9 NOTES ...
Page 1121: ...NOTES ...
Page 1200: ...SERVICE BRAKES Brake Pedal 35 79 Lubrication points Part A 14AO256 1 14UOO5l TSB Revision ...
Page 1273: ...NOTES t ...