[8-13 Parts Replacement Instructions ]
BS_08_E
chapter 8 -
85
8 Troub
le
sho
oting Bas
ed on Ob
ser
ved
Sy
mp
toms
(25B) Install the pipe below four-way valve (21S4b) and on the front by brazing at the two areas shown in Figure 24.
Re-place the rubber spacer.
Figure 24
Reinstall these pipes.
This step completes the replacement procedure for four-way valve (21S4b). Re-place the solenoid valve and LEV assembly
that were removed in step (8) and all the pipe covers that were removed during the maintenance work as they were.
(24B) Mount four-way valve (21S4b) to the pipe below four-way valve (21S4b) and in the middle. A total of five areas require
brazing, including the area indicated in (23B) and the areas indicated in Figure 23.
Mount four-way valve (21S4b) horizontal to four-way valve (21S4a) as shown in (15A).
Figure 23
When installing four-way valve
(21S4b), first braze the pipe
outside the unit and then install it
to the unit.
0000004986.BOOK 85 ページ 2019年5月9日 木曜日 午後6時22分
Summary of Contents for City Multi CMH-WM250V-A
Page 1: ......
Page 11: ...GB_BS_01_G 0000005109 BOOK 2 ページ 2019年5月9日 木曜日 午前10時1分 ...
Page 37: ...GB_BS_02_E 0000004972 BOOK 2 ページ 2019年5月8日 水曜日 午後2時48分 ...
Page 67: ...GB_BS_03_E 0000004974 BOOK 2 ページ 2019年5月9日 木曜日 午後6時11分 ...
Page 91: ...GB_BS_04_E 0000004976 BOOK 2 ページ 2019年5月8日 水曜日 午後2時57分 ...
Page 119: ...GB_BS_05_E 0000004980 BOOK 2 ページ 2019年5月9日 木曜日 午後6時18分 ...
Page 149: ...GB_BS_06_E 0000004982 BOOK 2 ページ 2019年5月8日 水曜日 午後3時4分 ...
Page 163: ...GB_BS_07_E 0000004984 BOOK 4 ページ 2019年5月17日 金曜日 午前8時21分 ...
Page 391: ...GB_BS_09_C 0000005077 BOOK 2 ページ 2019年5月8日 水曜日 午後3時12分 ...
Page 409: ...GB_BS_10_E 0000004988 BOOK 2 ページ 2019年5月9日 木曜日 午前8時15分 ...
Page 436: ......