[1-2 Handling and Characteristics of Piping Materials, Refrigerant, and Refrigerant Oil ]
10 -
chapter 1
BS_01_G
1
Che
ck Bef
o
re
Se
rvicing
Repair
1) Portable equipment shall be repaired outside or in a workshop specially equipped for servicing units with slightly flammable
refrigerants.
2) Ensure sufficient ventilation at the repair place.
3) Be aware that malfunction of the equipment may be caused by refrigerant loss and a refrigerant leak is possible.
4) Discharge capacitors in a way that won't cause any spark.
5) When brazing is required, the following procedures shall be carried out in the right order:
1. Remove the refrigerant. If the recovery is not required by national regulations, drain the refrigerant to the outside. Take care
that the drained refrigerant will not cause any danger. In doubt, one person should guard the outlet. Take special care that
drained refrigerant will not float back into the building.
2. Evacuate the refrigerant circuit.
3. Purge the refrigerant circuit with nitrogen for 5 min.
4. Evacuate again.
5. Remove parts to be replaced by cutting, not by flame.
6. Purge the braze point with nitrogen during the brazing procedure.
7. Carry out a leak test before charging with refrigerant.
6) Reassemble sealed enclosures accurately. If seals are worn, replace them.
7) Check safety equipment before putting into operation.
Decommissioning
1) If the safety is affected when the equipment is putted out of service, the charged refrigerant shall be removed before decom-
missioning.
2) Ensure sufficient ventilation at the equipment location.
3) Be aware that malfunction of the equipment may be caused by refrigerant loss and a refrigerant leak is possible.
4) Discharge capacitors in a way that won't cause any spark.
5) Remove the refrigerant. If the recovery is not required by national regulations, drain the refrigerant to the outside. Take care
that the drained refrigerant will not cause any danger. In doubt, one person should guard the outlet. Take special care that
drained refrigerant will not float back into the building.
6) Evacuate the refrigerant circuit.
7) Purge the refrigerant circuit with nitrogen for 5 min.
8) Evacuate again.
9) Fill with nitrogen up to atmospheric pressure.
10) Put a label on the equipment that the refrigerant is removed.
Disposal
1) Ensure sufficient ventilation at the working place.
2) Remove the refrigerant. If the recovery is not required by national regulations, drain the refrigerant to the outside. Take care
that the drained refrigerant will not cause any danger. In doubt, one person should guard the outlet. Take special care that
drained refrigerant will not float back into the building.
3) Evacuate the refrigerant circuit.
4) Purge the refrigerant circuit with nitrogen for 5 min.
5) Evacuate again.
6) Cut out the compressor and drain the oil.
0000005109.BOOK 10 ページ 2019年5月9日 木曜日 午前10時1分
Summary of Contents for City Multi CMH-WM250V-A
Page 1: ......
Page 11: ...GB_BS_01_G 0000005109 BOOK 2 ページ 2019年5月9日 木曜日 午前10時1分 ...
Page 37: ...GB_BS_02_E 0000004972 BOOK 2 ページ 2019年5月8日 水曜日 午後2時48分 ...
Page 67: ...GB_BS_03_E 0000004974 BOOK 2 ページ 2019年5月9日 木曜日 午後6時11分 ...
Page 91: ...GB_BS_04_E 0000004976 BOOK 2 ページ 2019年5月8日 水曜日 午後2時57分 ...
Page 119: ...GB_BS_05_E 0000004980 BOOK 2 ページ 2019年5月9日 木曜日 午後6時18分 ...
Page 149: ...GB_BS_06_E 0000004982 BOOK 2 ページ 2019年5月8日 水曜日 午後3時4分 ...
Page 163: ...GB_BS_07_E 0000004984 BOOK 4 ページ 2019年5月17日 金曜日 午前8時21分 ...
Page 391: ...GB_BS_09_C 0000005077 BOOK 2 ページ 2019年5月8日 水曜日 午後3時12分 ...
Page 409: ...GB_BS_10_E 0000004988 BOOK 2 ページ 2019年5月9日 木曜日 午前8時15分 ...
Page 436: ......