[1-2 Handling and Characteristics of Piping Materials, Refrigerant, and Refrigerant Oil ]
12 -
chapter 1
BS_01_G
1
Che
ck Bef
o
re
Se
rvicing
13. Installation restrictions for Hydro units
C: Create an appropriate ventilation open area.
NG
Good
Longitudinal
direction
Width of an opening
≥ 0.9 m
Height from the ground to
an opening ≥ 0.125 m
Opening:
•
Must occupy 80% of the
longitudinal side of a space.
•
Must have an opening ratio of
75% or higher.
(Example: space with a louver)
(Example:
basement)
Height of an opening
≥ 0.15 m
• Do not place an ignition source in a space where a Hydro unit is installed or adjacent spaces not shielded by
firewalls.
Examples: Lighters, combustion heaters, combustion boilers, and combustion cookers
• Figure 2 shows the minimum floor areas required for given amounts of refrigerant in various refrigerant
systems. Make sure the installation conditions meet the requirements shown in the figure. Take appropriate
safety measures in accordance with the instructions provided in Figure 2.
• When installing a Hydro unit in a machine room or a riser, minimum floor area requirements shown in Figure 2
(system refrigerant amount / minimum floor area ≤ 0.11) must be observed, and the Hydro unit must be installed
at a height of 1.8 meters or higher.
• All of the above-mentioned restrictions apply not only to new installations but also to relocations and layout
changes.
[Restrictions for Hydro unit installation]
Observe the following restrictions that apply to the installation of Hydro unit.
Figure 2
In addition to what is listed below, floor-standing units will require an agitator.
0
10
20
30
40
50
60
70
80
0
50
100
150
200
250
300
350
400
450
500
550
600
650
At least two safety
measures are
required.
Room volume [m
3
]
System refrigerant amount [kg]
NG (ISO 5149)
At least one safety
measure is required.
Construction guidance
0000005109.BOOK 12 ページ 2019年5月9日 木曜日 午前10時1分
Summary of Contents for City Multi CMH-WM250V-A
Page 1: ......
Page 11: ...GB_BS_01_G 0000005109 BOOK 2 ページ 2019年5月9日 木曜日 午前10時1分 ...
Page 37: ...GB_BS_02_E 0000004972 BOOK 2 ページ 2019年5月8日 水曜日 午後2時48分 ...
Page 67: ...GB_BS_03_E 0000004974 BOOK 2 ページ 2019年5月9日 木曜日 午後6時11分 ...
Page 91: ...GB_BS_04_E 0000004976 BOOK 2 ページ 2019年5月8日 水曜日 午後2時57分 ...
Page 119: ...GB_BS_05_E 0000004980 BOOK 2 ページ 2019年5月9日 木曜日 午後6時18分 ...
Page 149: ...GB_BS_06_E 0000004982 BOOK 2 ページ 2019年5月8日 水曜日 午後3時4分 ...
Page 163: ...GB_BS_07_E 0000004984 BOOK 4 ページ 2019年5月17日 金曜日 午前8時21分 ...
Page 391: ...GB_BS_09_C 0000005077 BOOK 2 ページ 2019年5月8日 水曜日 午後3時12分 ...
Page 409: ...GB_BS_10_E 0000004988 BOOK 2 ページ 2019年5月9日 木曜日 午前8時15分 ...
Page 436: ......