[6-5 Hydro Unit Replacement Instructions ]
BS_06_E
chapter 6 -
9
6 Tes
t Ru
n
6-5
Hydro Unit Replacement Instructions
6-5-1
Debris removal operation
This operation removes the debris that may have been introduced during installation from the water circuit.
Perform this operation
after completion of water- and refrigerant-piping work, air tightness test, evacuation
of refrigerant circuits, refrigerant charging, and electrical work.
1.Preparation for debris removal operation
2.Debris removal operation
3.End processing
3.Supply water from the suction pipe on the Hydro unit.
4.
Check that water comes from each air vent valve, and set DIPSW 011-4 to OFF to perform the debris removal
operation.
1.If there are a large amount of debris in the water in the field-installed pipes, set DIPSW 002-1 from OFF to ON.
(Refer to the flowchart for debris removal operation for details.)
Perform the debris removal operation. (Each air vent valve should stay open.)
5.Make sure the strainers are re-installed.
<General cautions>
Step 1
Step 2
The operation is performed while air is
discharged from the water pipe. [Air0]
Debris in the pipe will accumulate into the
strainer by operating all indoor units. [Air1 to AirE]
Intermittent operation of water pump (20 min)
Operation of all indoor units (20 min)
Flowchart for debris removal operation (DIPSW2-1 is ON.)
Install a non-return valve to prevent water in the water circuit
flowing back to the water supply pipe, or remove the water
supply hose after the air vent operation.
Indoor unit (Example: PEFY-W-VMA-E)
1.Turn on the breaker, and then open the auto air vent valve (accessary) on the water piping and the air vent valves on
the indoor units.
Refer to the Installation Manual for the location of air vent valves.
(If there are air vent valves on the field-installed pipes, open the valves as well.)
2.Forty minutes after the completion of debris removal operation, the LED will indicate "AirE." The LED indication will
change to "Air0," "Air1," and "AirE" in order. Then, the water pump will stop.
3.Stop the water supply, and check that no water is coming out of the air vent valves.
4.Open the water-vent valve.
Slowly open the strainer. (Note that if it is opened fast, water may blast out.)
Remove the strainer, clean its inside, and refit it.
(1) The operation can be forced to stop by setting DIPSW 002-4 from OFF to ON.
(2) If it is found during any step that debris removal operation has not been completed to the desired degree, start over at
Step 2-1.
(1) To avoid malfunction, do not connect or disconnect the power connector of the water pump being powered on.
(2) Check for water leaks from the field-installed pipe joint during operation.
(3) Do not pull the housing joint on the connection of the water pipe with pliers so that undue force is applied.
(4) If Error appears on the LED, turn off the breaker, turn it back on, and start over at step 2-1.
LED and DIPSW positions
2.Set DIPSW 011-1 to ON. (→Opens the flow control valve and facilitates water flow)
Set the dipswitche 002-1 to OFF after completion of debris removal operation.
0000004982.BOOK 9 ページ 2019年5月8日 水曜日 午後3時4分
Summary of Contents for City Multi CMH-WM250V-A
Page 1: ......
Page 11: ...GB_BS_01_G 0000005109 BOOK 2 ページ 2019年5月9日 木曜日 午前10時1分 ...
Page 37: ...GB_BS_02_E 0000004972 BOOK 2 ページ 2019年5月8日 水曜日 午後2時48分 ...
Page 67: ...GB_BS_03_E 0000004974 BOOK 2 ページ 2019年5月9日 木曜日 午後6時11分 ...
Page 91: ...GB_BS_04_E 0000004976 BOOK 2 ページ 2019年5月8日 水曜日 午後2時57分 ...
Page 119: ...GB_BS_05_E 0000004980 BOOK 2 ページ 2019年5月9日 木曜日 午後6時18分 ...
Page 149: ...GB_BS_06_E 0000004982 BOOK 2 ページ 2019年5月8日 水曜日 午後3時4分 ...
Page 163: ...GB_BS_07_E 0000004984 BOOK 4 ページ 2019年5月17日 金曜日 午前8時21分 ...
Page 391: ...GB_BS_09_C 0000005077 BOOK 2 ページ 2019年5月8日 水曜日 午後3時12分 ...
Page 409: ...GB_BS_10_E 0000004988 BOOK 2 ページ 2019年5月9日 木曜日 午前8時15分 ...
Page 436: ......