Preoperative Checklist
Periodic Maintenance
6 - 42
13. Check Unidirectional Valves:
a.
Set the Ventilation mode to
STANDBY
.
b.
Set the APL Valve to
20
cmH
2
O
c.
Attach a test lung to the Y-fitting of the breathing circuit.
d.
Set the AIR flow to 5 L/min.
e.
Press the O
2
Flush Valve to fill the breathing bag with volume.
f.
Slowly squeeze the breathing bag once every 10 seconds.
g.
Verify that the test lung inflates and deflates.
h.
Verify that the inspiratory unidirectional valve opens when the test lung inflates.
i.
Verify that the expiratory unidirectional valve opens when the test lung deflates.
14. Test drive gas pressure failure system:
a.
Set the O
2
, N
2
O, and AIR gas flows to mid-range using the flow control knobs.
b.
Close the O
2
gas cylinder using the Tank Wrench.
c.
Verify that the O
2
and N
2
O flows fall to zero.
d.
Verify that:
• An alarm tone sounds.
• The alarm message
O
2
Supply Failure
is displayed on the screen.
e.
Open the O
2
gas cylinder. Verify that the alarm tone stops and the alarm message is
removed from the screen.
f.
Close all gas cylinders.
g.
Remove the O
2
.
h.
Verify that:
• An alarm tone sounds.
• the alarm message
O
2
Supply Failure
is displayed on the screen.
i.
Shut off all flow control valves.
15. High Pressure Leak Test:
a.
Connect a breathing circuit and breathing bag to the Breathing System.
b.
Set APL Valve to
70
cmH
2
O.
c.
Connect the breathing circuit Y-fitting to the test port on the
.
d.
Inflate breathing bag by pressing the O
2
Flush Valve until the pressure gauge
reaches 40 cmH
2
O.
e.
Verify that breathing circuit holds pressure for a minimum of 10 seconds.
Summary of Contents for Datascope AS 3000
Page 2: ...AS Datascope Anesthesia Delivery System Service Manual...
Page 9: ...Table of Contents vi 0070 10 0683 AS3000 Service Manual This page intentionally left blank...
Page 13: ...Introduction Notes x 0070 10 0683 AS3000 Service Manual This page intentionally left blank...
Page 179: ...0070 10 0683 Rev K August 8 2014...