6 - 25
Periodic Maintenance
Functional Tests
6.8.5.5
N
2
O Line Pressure Leak Test
1.
Remove the N
2
O cylinder from the
2.
Connect the N
2
O line pressure hose to the line pressure inlet on the
.
3.
Pinch the N
2
O line pressure hose to stop N
2
O line flow.
4.
Remove the N
2
O line pressure hose from the N
2
O line source.
5.
The N
2
O line pressure gauge should not fall more than 2 psi in 20 seconds.
6.
Reconnect the N
2
O line pressure and remove the pinch in the hose.
6.8.5.6
O
2
Line Pressure Leak Test
1.
Remove the O
2
cylinder from the
.
2.
Connect the O
2
line pressure hose to the line pressure inlet on the
.
3.
Pinch the O
2
line pressure hose to stop O
2
line flow.
4.
Remove the O
2
line pressure hose from the O
2
line source.
5.
The O
2
line pressure gauge should not fall more than 2 psi in 20 seconds.
6.
Reconnect the O
2
line pressure and remove the pinch in the hose.
6.8.5.7
AIR Line Pressure Leak Test
1.
Remove the AIR cylinder from the
.
2.
Connect the AIR line pressure hose to the line pressure inlet on the
3.
Pinch the AIR line pressure hose to stop AIR line flow.
4.
Remove the AIR line pressure hose from the AIR line source.
5.
The AIR line pressure gauge should not fall more than 2 psi in 20 seconds.
6.
Reconnect the AIR line pressure and remove the pinch in the hose.
6.8.5.8
Cylinder Supply Check Valves Test
1.
Close and remove all gas cylinders from the
2.
Verify the cylinder gauges return to zero.
3.
Using the Digital Flow Meter, verify that no gas is escaping from any of the three yoke
connections on the
4.
Verify there is no external damage to the gas cylinder or yoke pins.
5.
Reconnect the cylinder(s) as necessary.
Summary of Contents for Datascope AS 3000
Page 2: ...AS Datascope Anesthesia Delivery System Service Manual...
Page 9: ...Table of Contents vi 0070 10 0683 AS3000 Service Manual This page intentionally left blank...
Page 13: ...Introduction Notes x 0070 10 0683 AS3000 Service Manual This page intentionally left blank...
Page 179: ...0070 10 0683 Rev K August 8 2014...