Chapter 14: Software installation, upgrade, and update procedures
463
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
Procedure 8: Load the application software from tape (continued)
12
You are prompted for the second group of keycode characters. Type
the second group and press [Return].
Figure 234
Keycode prompt 3
Keycode group 3 (or Q or q to quit):
13
You are prompted for the third group of keycode characters. Type
the third group and press [Return].
Figure 235
Keycode prompt 4
Keycode group 4 (or Q or q to quit):
14
You are prompted for the fourth group of keycode characters. Type
the fourth group and press [Return].
Figure 236
Keycode prompt 5
Keycode group 5 (or Q or q to quit):
15
You are prompted for the fifth group of keycode characters. Type the
fifth group and press [Return].
A list of configured applications appears.
Note:
Optional feature prompts will not appear if the features were not
configured in the keycode. For example, if Meridian Link was not
purchased, the prompts in Figures 237, 238, and 239 will not appear.
Figure 237
Meridian Link protocol prompt
Please enter the Meridian Link protocol, x for X.25, <cr> for TCP/IP):
Summary of Contents for Link/Customer Controlled Routing
Page 2: ...ii 553 3202 210 Standard October 1998...
Page 4: ...iv Publication history 553 3202 210 Standard October 1998...
Page 14: ...xiv Contents 553 3202 210 Standard October 1998...
Page 56: ...38 Chapter 3 Overview of Customer Controlled Routing 553 3202 210 Standard October 1998...
Page 132: ......
Page 168: ...150 Chapter 8 Hardware installation procedures 553 3202 210 Standard October 1998...
Page 388: ...370 Chapter 13 Meridian Mail configuration 553 3202 210 Standard October 1998...
Page 562: ...544 Chapter 19 Single Terminal Access 553 3202 210 Standard October 1998...
Page 570: ...552 Chapter 20 Ordering 553 3202 210 Standard October 1998...